項目地址:深圳南山區(qū)學(xué)苑大道1066 號
建設(shè)單位:深圳市建筑工務(wù)署
設(shè)計單位:深圳大學(xué)建筑設(shè)計研究院有限公司
主創(chuàng)建筑師:艾志剛
竣工年份:2017 年
建筑面積:17 799 平方米
項目造價:1.5 億
設(shè)計團(tuán)隊:艾志剛、張苑、張波、牟冰冰、肖振、胡云霞、武迎建、李赫、鄭艱超、肖東開、劉琴、唐進(jìn)
工程施工總承包:上海寶冶集團(tuán)有限公司
室內(nèi)施工總承包:深圳市華劍建設(shè)集團(tuán)股份有限公司
Location:Shenzhen,China
Client:Bureau public of Shenzhen Municipality
Architect:Architecture Design & Research Institute of Shenzhen University
Principal Architects:Ai Zhigang
Completion date:2017
Area:17 799 m2
Project cost:150 million
Project Team:Ai Zhigang,Zhang Yuan,Zhang Bo,Mu Bingbing,Xiao Zhen,Hu Yunxia,Wu Yingjian,Li He,Zhen Jianchao,Xiao Dongkai,Liu Qin,Tang Jin
Construction contractor:Shanghai Baoye Group Corp,Ltd.
Interior Construction:Shenzhen Huajian Construction Group Co.,Ltd
1、多種功能模式A.比賽模式:滿足國家籃球館3星以上比賽和觀看標(biāo)準(zhǔn)。設(shè)置運(yùn)動員、裁判員休息室、熱身場地等;B.練習(xí)模式:首層活動座椅收回,運(yùn)動場地最大化,可作為羽毛球、排球練習(xí)場;C.其他模式:通過設(shè)置臨時隔斷,可舉辦會議、展覽、文藝表演等多種活動。
2、立體化交通組織底層是運(yùn)動員、工作人員、設(shè)備器材入口、貴賓、新聞媒體入口;二層是觀眾入口;地下室是車庫和人防工程,可作為VIP和管理人員入口。
3、綠色建筑策略觀眾廳南北向設(shè)置大面積玻璃窗,在平時練習(xí)模式,可以充分利用自然通風(fēng)、采光,降低能源消耗。
4、動感的建筑外觀建筑外觀通過連續(xù)傾斜的折線墻體營造出體育的動勢?!罢郯濉庇傻孛鎯A斜而上,形成二層主要觀眾活動平臺后,緩緩向上后突然騰空而起,傾斜翻轉(zhuǎn)包裹出觀眾廳空間,繼而向下內(nèi)收出觀眾入口大廳。建筑造型與空間一氣呵成,體現(xiàn)體育運(yùn)動的動感與力量之美。
1.Multi function mode(A).Competition mode:Xili gym can hold the 3-star or above national basketball competition achieving the watching standards.The rooms for athletes and referees,warm-up venues are also set up.(B).Practice mode:The first floor activity seats can retract to maximize the sports ground .The ground can not only serve as the badminton practise ground,but also the volleyball.(C).Other modes:By setting temporary partition,Xili gym can hold various activities such as conference,exhibition,art performance and so on.
2.Three dimensional traffic organizationThe first floor contains the entrances of athletes,staff,equipment,VIP and news media.The audience entrance is on the second floor.The basement is used as parking and civil air defense project,which can be the entrance for VIP and management personnel.
3.Green building strategyLarge area glass windows are set in the north and south elevation of the auditorium.Natural ventilation and lighting can be fully used to reduce energy consumption in normal times.
4.Dynamic architectural sculptureXili gym creates sports dynamic architectural sculpture by continuous inclined broken line.“ The folding board”tilts upward from the ground to form the two-story main audience activity platform.It slowly rises upward ,then suddenly rises,creating the auditorium space.Then it retracts downward and inward creating the auditorium entrance hall.The architectural form and space are integrated to embody the dynamic and powerful beauty of sports.
剖面圖 Section
總平面圖 Site Plan
分析圖 Analysis Diagram
形體演變 Shape Evolution
概念模型 Conceptual Model
平面圖 Plan