于普 馬艷麗
【摘 要】高壓定噴截滲墻是由定噴形成板狀墻段,并依照不同角度彼此搭接起來(lái),最終形成的地下截滲防滲墻,具有良好的防滲效果及耐久性。高壓定噴灌漿施工簡(jiǎn)便、機(jī)械化程度高、施工截滲性好,因此在堤防防滲工程中得到廣泛的應(yīng)用,本文以某堤防堤身防滲加固施工為例,對(duì)二管法高壓定噴截滲墻的施工工藝、施工過(guò)程控制及成墻后質(zhì)量檢驗(yàn)等方面進(jìn)行探討。
【關(guān)鍵詞】高壓定噴截滲墻;施工工藝;過(guò)程控制;質(zhì)量檢驗(yàn)
中圖分類號(hào): TV223.42;TV66 文獻(xiàn)標(biāo)識(shí)碼: A 文章編號(hào):2095-2457(2018)05-0136-003
【Abstract】High-pressure fixed spray cutoff wall is formed by fixed spray to form a plate-shaped wall segment, and overlaps each other according to different angles.The resulting underground cut-off seepage prevention wall has good anti-seepage effect and durability.The high-pressure fixed-jet grouting has the advantages of simple construction, high degree of mechanization,and good construction interceptibility. Therefore, it has been widely used in embankment anti-seepage projects.The construction technology of the seepage wall, the control of the construction process and the quality inspection after the wall is discussed.
【Key words】High pressure fixed spray cutoff wall;Construction process;Process control;Quality inspection
0 前言
高壓定噴截滲墻施工工藝技術(shù)是70年代日本首先提出,它是在靜壓灌漿的基礎(chǔ)上,引進(jìn)水力采煤技術(shù)而發(fā)展起來(lái)的,是利用高速噴射流束,沖擊、切割、破碎地層,改變?cè)貙拥慕Y(jié)構(gòu)和組成,同時(shí)灌入水泥漿或復(fù)合漿形成墻樁凝結(jié)體,借以達(dá)到防滲的目的。高壓定噴灌漿技術(shù)可適用于黏土、粉土、砂土、礫卵石、淤泥質(zhì)土等,施工方法包括單管法、二管法及三管法,應(yīng)根據(jù)不同地層結(jié)構(gòu)、土體密實(shí)度及設(shè)計(jì)要求選擇合適的施工方法。
1 高壓定噴截滲墻應(yīng)用案例
某一級(jí)堤防險(xiǎn)點(diǎn)加固工程中,堤身68+980~69+300段由于歷年受到汛期水流侵蝕嚴(yán)重,造成背河側(cè)堤身出現(xiàn)滲漏現(xiàn)象,給附近居民生命及財(cái)產(chǎn)安全帶來(lái)極大隱患,經(jīng)現(xiàn)場(chǎng)勘測(cè)本段堤防所處的地層自上而下分別為黏土、壤土、砂壤土、砂土,地下水位位于堤頂以下12m~13m,綜合考慮防滲深度及防滲效果的前期下,經(jīng)研究決定采用高壓定噴截滲墻技術(shù)進(jìn)行施工,截滲墻設(shè)計(jì)深度為19.5m。截滲墻采用Ⅰ序孔、Ⅱ序孔分別施工,搭接布置如下圖1:
高壓定噴截滲墻施工方案為施工準(zhǔn)備、試樁施工、工程樁施工、質(zhì)量檢驗(yàn)四個(gè)階段。
1.1施工準(zhǔn)備
1.1.1 原材料的準(zhǔn)備
高壓定噴灌漿施工宜使用水泥漿,因此水泥材料的選擇尤為重要,是影響高壓定噴防滲墻施工質(zhì)量的關(guān)鍵因素。水泥應(yīng)選擇生產(chǎn)技術(shù)成熟、產(chǎn)品穩(wěn)定、生產(chǎn)能力大水泥生產(chǎn)廠家,經(jīng)考察最終確定采用山水集團(tuán)生產(chǎn)的42.5級(jí)普通硅酸鹽水泥。
1.1.2 機(jī)械設(shè)備的準(zhǔn)備
(1)XY-2型鉆機(jī),鉆孔孔徑Φ110mm,主要用于高噴灌漿孔的鉆孔作業(yè);
(2)GP-1800-2高壓定噴臺(tái)車,高塔架無(wú)機(jī)調(diào)速型,噴管直徑Φ89mm,噴嘴直徑1.8mm~2.0mm,主要用于噴漿提升成墻作業(yè);
(3)3D-S8-75/500高壓灌漿泵,將高壓漿液輸送到高壓噴漿管中;
(4)VF-6/7-A空壓機(jī),提供高壓氣體;
(5)YJG-80立式灰漿攪拌機(jī),拌制水泥漿液;
(6)1m3集料斗,儲(chǔ)存拌制好的水泥漿液,進(jìn)漿口應(yīng)設(shè)置過(guò)濾網(wǎng)過(guò)濾未攪拌均勻的水泥結(jié)塊;
(7)發(fā)電機(jī)。
1.1.3 現(xiàn)場(chǎng)準(zhǔn)備
(1)場(chǎng)地清理
施工前,按照施工規(guī)范的要求進(jìn)行場(chǎng)地清理。清理后的場(chǎng)地應(yīng)平整,并做好排水。
(2)布樁圖
開(kāi)工前,根據(jù)圖紙標(biāo)明線路中心、里程、堤肩線、每根樁編上編號(hào),標(biāo)出設(shè)計(jì)樁長(zhǎng)。
(3)測(cè)量放樣
首先對(duì)設(shè)計(jì)單位移交的導(dǎo)線點(diǎn)與水準(zhǔn)點(diǎn),會(huì)同監(jiān)理工程師進(jìn)行復(fù)核,確認(rèn)無(wú)誤后再使用。測(cè)量人員按設(shè)計(jì)圖紙、布樁圖,進(jìn)行樁位、原地表標(biāo)高、樁位孔口標(biāo)高等有關(guān)測(cè)量放樣工作。
1.2 試樁施工
高壓定噴截滲墻正式施工前應(yīng)進(jìn)行工藝性試樁施工,試樁地點(diǎn)選擇在與工程樁施工條件相近的區(qū)域,試樁深度不小于設(shè)計(jì)要求,試樁材料與施工一致,以掌握適用該區(qū)段的成樁經(jīng)驗(yàn)及獲取各種操作技術(shù)參數(shù):
(1)滿足設(shè)計(jì)要求的各種技術(shù)參數(shù),包括鉆機(jī)鉆進(jìn)與提升速度、噴氣壓力、單位時(shí)間的噴入量、水泥漿壓力、單位時(shí)間用漿量、水泥漿比重等;
(2)檢驗(yàn)選定的施工設(shè)備和施工工藝是否滿足要求;
(3)校驗(yàn)連續(xù)墻抗?jié)B性能是否滿足要求。
由于高壓定噴截滲墻是地下隱蔽工程,施工過(guò)程控制就非常重要,只有通過(guò)工藝性試樁,取得較適宜符合工程實(shí)際情況的施工工藝參數(shù),才能用以指導(dǎo)大面積施工,工藝試樁參數(shù)的準(zhǔn)確性、可靠性是后續(xù)工程樁施工質(zhì)量的有力保障。
1.3 工程樁施工
1.3.1 施工場(chǎng)地平整和規(guī)劃
對(duì)施工場(chǎng)地進(jìn)行平整,對(duì)低洼和表部松散部位回填、夯實(shí)和加固,以滿足施工機(jī)械行走的需要。
施工制漿、噴漿與排廢漿區(qū)域應(yīng)合理規(guī)劃,制漿區(qū)與高噴區(qū)距離應(yīng)保持不小于20m的距離且不大于100m,保證高壓作業(yè)的安全性及施工連續(xù)性,廢漿排放池應(yīng)根據(jù)工程需要選擇不妨礙施工的位置開(kāi)挖排漿溝和廢漿池,廢漿池中間用細(xì)孔濾網(wǎng)間隔,一側(cè)池底高程高出另一側(cè)2m,以便將廢棄漿液過(guò)濾后回灌使用,既節(jié)約成本又減少了對(duì)環(huán)境的污染。
1.3.2 鉆機(jī)鉆孔
調(diào)整鉆機(jī)呈水平狀態(tài),穩(wěn)固后方可開(kāi)孔。開(kāi)孔孔位與設(shè)計(jì)孔位的偏差不大于5cm。采用套管鉆進(jìn)直接到設(shè)計(jì)孔深,起鉆后注入護(hù)壁泥漿,用拔管機(jī)拔出套管并保護(hù)好孔口,防止異物掉入孔內(nèi),鉆孔分Ⅰ、Ⅱ兩個(gè)次序進(jìn)行。
鉆孔時(shí)采取防止孔斜的措施,可使用鉆桿懸掛鉛垂配合測(cè)斜儀的方法控制孔斜率,鉆孔完成后進(jìn)行孔斜和孔深測(cè)量,由質(zhì)檢人員進(jìn)行工序驗(yàn)收,檢測(cè)孔深超過(guò)設(shè)計(jì)墻底深度0.3m、孔底偏斜率不超過(guò)1%以后方可終孔,鉆孔終孔驗(yàn)收合格后,對(duì)孔口妥善保護(hù)。
1.3.3 高噴臺(tái)車就位
使用液壓步履裝置使高噴臺(tái)車的井口裝置對(duì)準(zhǔn)孔口,然后升降液壓支腿調(diào)平臺(tái)車,并進(jìn)行試噴檢查,各管路及機(jī)械正常。
1.3.4 噴管定位
根據(jù)測(cè)量人員布置好的樁位及現(xiàn)場(chǎng)控制點(diǎn),由技術(shù)人員現(xiàn)場(chǎng)放出具體孔位及墻體位置,現(xiàn)場(chǎng)將墻體兩端與孔中心位插入鋼釬用鋼絲連接成線,調(diào)整高噴臺(tái)車兩側(cè)噴頭位置與控制線重合,孔位中心偏差不大于5cm。
1.3.5 制漿
高壓噴射灌漿主要采用水泥漿液,漿液水灰比可為1.5:1~0.6:1(密度約1.4g/cm3~1.7g/cm3),要通過(guò)現(xiàn)場(chǎng)高噴試樁試驗(yàn)確定適宜的水灰比范圍。使用高速攪拌機(jī)攪拌時(shí)間不低于30s,使用普通攪拌機(jī)攪拌時(shí)間不低于90s,水泥漿自制備至用完時(shí)間不應(yīng)超過(guò)4h。用玻璃比重計(jì)測(cè)量漿液比重,符合要求后,經(jīng)過(guò)濾網(wǎng)對(duì)漿液進(jìn)行過(guò)濾后存在1m3的貯漿桶中,進(jìn)行噴灌施工。
1.3.6 噴射灌漿
下噴射管前應(yīng)進(jìn)行地面試噴,檢查機(jī)械及管路運(yùn)行情況,并復(fù)核噴管的噴射放向。將噴頭下至設(shè)計(jì)深度,先開(kāi)動(dòng)高壓泥漿泵供漿,然后開(kāi)動(dòng)管道水泵噴射,再開(kāi)動(dòng)空壓機(jī)供氣,靜噴約30s,檢查各參數(shù)均符合設(shè)計(jì)要求后按擬定的參數(shù)開(kāi)始提升,在離設(shè)計(jì)墻頂高程1.0m時(shí)放慢提升速度,到達(dá)設(shè)計(jì)墻頂后靜噴30s。
應(yīng)注意:
(1)由于地層土質(zhì)不同,尤其在砂土地層如果鉆孔與噴灌間隔時(shí)間過(guò)長(zhǎng)會(huì)出現(xiàn)局部塌孔阻礙噴頭的下沉的情況,此時(shí)可邊噴漿邊小幅度上下移動(dòng)噴管,利用漿液的潤(rùn)滑和噴管的自重沖破塌孔段;
(2)高噴灌漿過(guò)程中,應(yīng)每隔一段時(shí)間測(cè)定孔口回漿密度,若孔口回漿密度變小、回漿量增大,應(yīng)降低氣壓并降低進(jìn)漿水灰比或增大進(jìn)漿量。
1.3.7 孔口回填
高壓定噴灌漿結(jié)束后,由于孔內(nèi)的漿液發(fā)生泌水、沉淀和凝結(jié)收縮,高噴凝結(jié)體的頂部會(huì)產(chǎn)生凹穴,需要用漿液及時(shí)回灌填補(bǔ),在施工時(shí)應(yīng)充分利用孔口回漿進(jìn)行回灌。噴射灌漿結(jié)束后,關(guān)閉管道漿液及高壓氣,將廢漿沉淀池中經(jīng)過(guò)過(guò)濾的回漿重新泵送到孔內(nèi),直至孔口漿液下降不明顯時(shí),結(jié)束供漿。
應(yīng)注意在粘性土含量較多的地層中進(jìn)行高噴灌漿時(shí),孔口回漿已混合了大量的粘性土顆粒,難以通過(guò)沉淀、過(guò)濾難以從漿液中分離出去,造成孔口回漿密度超過(guò)進(jìn)漿密度,這樣的漿液不宜回收利用。因此應(yīng)重視回漿密度的監(jiān)測(cè)及通過(guò)經(jīng)驗(yàn)判斷回漿是否能作為回灌使用。
1.3.8 機(jī)具清洗
每噴射完一孔后,用清水沖洗機(jī)具及噴管噴頭,以免管路堵塞。
1.3.9 成墻施工
高噴灌漿作業(yè)分兩序進(jìn)行,噴射作業(yè)連續(xù)進(jìn)行,相鄰Ⅰ、Ⅱ序孔的作業(yè)時(shí)間間隔為12~72h。施工時(shí)根據(jù)現(xiàn)場(chǎng)施工情況調(diào)整同序孔的施工次序,如施工間隔時(shí)間過(guò)長(zhǎng),采取提高噴射壓力,降低提升速度等措施處理,確保Ⅰ、Ⅱ序墻體的可靠搭接。
1.4 施工工藝參數(shù)
1.4.1 施工參數(shù)的確定
高壓定噴截滲墻施工參數(shù)是通過(guò)工藝試樁試驗(yàn)及以往類似工程經(jīng)驗(yàn)綜合考慮確定,對(duì)以后工程樁的施工具有實(shí)際的指導(dǎo)作用。對(duì)于二管法施工的高壓定噴截滲墻在試樁中主要控制氣壓、氣量、漿壓、漿量、漿液比重及提升速度等參數(shù),在試樁過(guò)程中要及時(shí)記錄施工參數(shù),觀察孔口回漿情況及測(cè)定回漿密度,注意噴漿時(shí)產(chǎn)生的異常情況做到能及時(shí)調(diào)整施工參數(shù),以滿足施工需要。
由于高壓定噴截滲墻是地下隱蔽工程,試樁成墻效果是否能滿足設(shè)計(jì)要求不直觀,需要配合成墻后進(jìn)行墻體開(kāi)挖觀察成墻長(zhǎng)度、厚度及墻體搭接情況。成墻效果不理想時(shí)應(yīng)及時(shí)分析原因,調(diào)整施工參數(shù)再次進(jìn)行試樁試驗(yàn),直到取得合格的施工參數(shù)。工藝試樁參數(shù)不僅要滿足工程設(shè)計(jì)指標(biāo),同時(shí)也要考慮施工的經(jīng)濟(jì)性,要結(jié)合試驗(yàn)和工程經(jīng)驗(yàn)選擇合理的施工參數(shù)范圍。
1.4.2 本工程的施工參數(shù)
通過(guò)工藝試樁及試驗(yàn)檢測(cè)結(jié)果的比較,我部所確定的高壓定噴截滲墻施工參數(shù)為:
1.5 成墻質(zhì)量檢驗(yàn)
高壓定噴截滲墻質(zhì)量檢驗(yàn)宜采用開(kāi)挖檢查及圍井試驗(yàn)的方法進(jìn)行,由于高壓定噴墻體厚度較小,不宜采用鉆芯取樣方法進(jìn)行檢驗(yàn)。高壓定噴截滲墻質(zhì)量檢查點(diǎn)應(yīng)選擇在以下重點(diǎn)部位:
(1)地層復(fù)雜的部位;
(2)漏漿嚴(yán)重的部位;
(3)可能存在質(zhì)量缺陷的部位。
1.5.1 開(kāi)挖檢查
考慮到高壓定噴截滲墻在69+050、69+090兩處分別與現(xiàn)有一條跨河高速公路兩側(cè)路基防滲墻搭接形成整體防滲系統(tǒng),搭接處可能存在質(zhì)量缺陷及漏漿情況,我部分別在69+050、69+090兩處進(jìn)行了開(kāi)挖檢查。69+050處開(kāi)挖30#~33#孔,挖深2.5m、長(zhǎng)4.5m、寬2.0m;69+090處開(kāi)挖60#~62#孔,挖深2.4m、長(zhǎng)3m、寬2.0m。
根據(jù)開(kāi)挖檢查,墻體的外觀質(zhì)量較好,無(wú)蜂窩、孔洞,截滲墻整體性強(qiáng),墻頂高程、孔距、相鄰孔墻交接均符合要求。在鉆孔中心、墻體、相鄰墻連接處墻厚均≥10cm,在兩墻連接處墻體厚度達(dá)到15cm。Ⅱ序墻施工時(shí)均發(fā)現(xiàn)已噴穿Ⅰ序墻現(xiàn)象形成搭接面,這說(shuō)明成墻連續(xù)性較好,防滲墻成墻可靠。
1.5.2 圍井注水試驗(yàn)
在工程樁施工完成7天后,采用噴射圍井注水試驗(yàn)方法進(jìn)行滲透系數(shù)測(cè)定,測(cè)得截滲墻滲透系數(shù)平均值為5.60×10-7cm/s,均小于1×10-6cm/s,符合設(shè)計(jì)要求。
2 高壓定噴截滲墻施工技術(shù)要點(diǎn)
2.1 施工方法的選擇
高壓定噴截滲墻施工方法更適用于粉土和砂土,其他結(jié)構(gòu)地層施工前應(yīng)通過(guò)現(xiàn)場(chǎng)試驗(yàn)確定墻體防滲效果。二管法施工是利用兩個(gè)并列管將漿預(yù)拌好的水泥漿和壓縮空氣通過(guò)高壓的方法一次噴射成墻,其工序少、施工效率高,水泥漿比重容易控制,但對(duì)噴射孔位及噴嘴角度要求較高,誤差較大時(shí)無(wú)法達(dá)到預(yù)期的防滲效果,一般根據(jù)相鄰孔墻連接形式、噴嘴夾角大小和不同地層進(jìn)行試驗(yàn),以確定孔位布設(shè)、孔距、噴射角度及其他施工參數(shù)。
2.2 施工質(zhì)量及成本的控制
由于二管法施工水泥漿提前預(yù)拌,可通過(guò)試樁選擇能滿足施工質(zhì)量要求及經(jīng)濟(jì)性好的水泥漿比重,在施工中嚴(yán)格控制噴漿壓力和噴桿提升速度以達(dá)到理想的成墻效果。
高壓定噴的鉆桿直徑比單管高壓旋噴的鉆桿直徑大,鉆桿鋼度大,鉆孔垂直度好、偏離少,主要控制好相鄰孔墻斜向連接,相鄰孔孔距適當(dāng),高壓定噴交接幾率比單管高壓旋噴交接幾率大大提高,從而成墻質(zhì)量更有保障,施工費(fèi)用也較旋噴樁費(fèi)用低。
3 結(jié)語(yǔ)
綜上所述,高壓定噴截滲墻施工應(yīng)主要對(duì)前期工藝試樁參數(shù)收集及分析控制,對(duì)施工過(guò)程參數(shù)控制及調(diào)整,對(duì)成樁后質(zhì)量檢驗(yàn)控制,通過(guò)事前、事中、事后“三控制”的原則施工,可有效保證截滲墻的施工質(zhì)量。高壓定噴在堤防防洪、防滲加固施工中技術(shù)是可行的,經(jīng)濟(jì)是合理的,具有普遍意義和推廣應(yīng)用價(jià)值。