国产日韩欧美一区二区三区三州_亚洲少妇熟女av_久久久久亚洲av国产精品_波多野结衣网站一区二区_亚洲欧美色片在线91_国产亚洲精品精品国产优播av_日本一区二区三区波多野结衣 _久久国产av不卡

?

城市軌道交通的高質(zhì)量建設(shè)是高水平運(yùn)營的基礎(chǔ)保障

2023-08-28 07:10:28畢湘利
城市軌道交通研究 2023年8期
關(guān)鍵詞:產(chǎn)品認(rèn)證盾構(gòu)軌道交通

畢湘利

(上海申通地鐵集團(tuán)有限公司董事長,正高級(jí)工程師)

中國城市軌道交通五十余年的發(fā)展歷程,特別是近二十年的高速發(fā)展歷程證明:高質(zhì)量建設(shè)是城市軌道交通高水平運(yùn)營的基礎(chǔ)和前提。必須從人民群眾對美好生活的向往這一需求出發(fā),堅(jiān)持高起點(diǎn)、高水平,創(chuàng)新機(jī)制,突破束縛,構(gòu)建規(guī)劃起點(diǎn)高、標(biāo)準(zhǔn)合理適用、過程可靠受控、結(jié)果可核查可驗(yàn)證的城市軌道交通系統(tǒng)。

高質(zhì)量建設(shè)重在加強(qiáng)對城市軌道交通關(guān)鍵設(shè)施設(shè)備的過程管理。城市軌道交通裝備市場處于開放競爭的狀態(tài),產(chǎn)品質(zhì)量安全風(fēng)險(xiǎn)最終由運(yùn)營單位承擔(dān)。新線試運(yùn)營基本條件評審由于時(shí)間短、覆蓋范圍有限,難以對城市軌道交通系統(tǒng)功能進(jìn)行全過程控制和全范圍驗(yàn)證,難免遺留一些問題,危害運(yùn)營安全。因此在城市軌道交通關(guān)鍵設(shè)施設(shè)備過程管理中要全面引入產(chǎn)品認(rèn)證和功能驗(yàn)證的管理理念。實(shí)施全面產(chǎn)品認(rèn)證和功能驗(yàn)證是與國際接軌的市場準(zhǔn)入方式,也是促進(jìn)裝備產(chǎn)業(yè)健康發(fā)展的有效措施。全面產(chǎn)品認(rèn)證和功能驗(yàn)證在確保系統(tǒng)安全、確證系統(tǒng)功能、確立系統(tǒng)品質(zhì)方面具有不可替代的作用。因此,一要加大力度,完善行業(yè)標(biāo)準(zhǔn)體系,優(yōu)化檢驗(yàn)檢測規(guī)程,促進(jìn)第三方數(shù)據(jù)的有效應(yīng)用;二要強(qiáng)化檢測認(rèn)證力量,提升認(rèn)證、驗(yàn)證結(jié)果質(zhì)量,推動(dòng)認(rèn)證采信應(yīng)用,切實(shí)發(fā)揮認(rèn)證、驗(yàn)證在提高城市軌道交通關(guān)鍵設(shè)施設(shè)備安全質(zhì)量水平方面的作用,規(guī)范城市軌道交通裝備產(chǎn)業(yè)市場的良性發(fā)展。

高質(zhì)量建設(shè)重在發(fā)揮標(biāo)準(zhǔn)的引領(lǐng)作用。沒有規(guī)劃建設(shè)源頭的高標(biāo)準(zhǔn),就沒有運(yùn)營服務(wù)終端的高質(zhì)量。要做到既高標(biāo)準(zhǔn)建設(shè),滿足功能需求,又兼顧城市軌道交通行業(yè)的公益性、經(jīng)濟(jì)性和可持續(xù)性,就必須處理好標(biāo)準(zhǔn)提升和成本控制之間的平衡關(guān)系。因此,在建設(shè)實(shí)踐中,既要堅(jiān)持標(biāo)準(zhǔn)的引領(lǐng)作用,又要堅(jiān)持有破有立,統(tǒng)籌兼顧,以充分發(fā)揮城市軌道交通系統(tǒng)的整體效能。例如,上海地鐵將高速鐵路無砟軌道建設(shè)中的軌道控制網(wǎng)測量和無砟軌道精調(diào)相關(guān)技術(shù)標(biāo)準(zhǔn)引入城市軌道交通的建設(shè)與運(yùn)營維護(hù)中,大大提高了建設(shè)階段軌道鋪設(shè)的技術(shù)水平,實(shí)現(xiàn)了軌道鋪設(shè)的高精度和高平順,有效提升了列車運(yùn)行的平穩(wěn)度和乘客的舒適度,同時(shí)也降低了車內(nèi)外的噪聲和振動(dòng)以及車輛的故障率。又如,旅行速度體現(xiàn)城市軌道交通的運(yùn)營效率,但由于車輛、信號(hào)、軌道、結(jié)構(gòu)等各個(gè)專業(yè)對速度限制及控制的概念和定義在理解上存在差異,導(dǎo)致實(shí)際ATO(列車自動(dòng)運(yùn)行)模式下旅行速度低于線路等級(jí)速度。上海地鐵把各專業(yè)的速度限制及控制標(biāo)準(zhǔn)放在一個(gè)系統(tǒng)中進(jìn)行研究,使各專業(yè)之間的需求合理銜接,使旅行速度達(dá)到了設(shè)計(jì)要求,實(shí)現(xiàn)了線路等級(jí)速度。相關(guān)標(biāo)準(zhǔn)已作為團(tuán)體標(biāo)準(zhǔn)發(fā)布并在行業(yè)內(nèi)推廣應(yīng)用。再如,對于暗挖車站,從既有工程案例看,日本的多數(shù)盾構(gòu)法施工車站,其盾構(gòu)段長度均超過100 m,盾構(gòu)段最長的車站是飯?zhí)飿蛘?達(dá)到275 m。但國內(nèi)地下工程因受消防疏散規(guī)范的限制,中間不設(shè)開口的盾構(gòu)暗挖段最長不超過100 m,若考慮疏散路徑因素,暗挖段距離更小,極大地限制了暗挖車站施工技術(shù)的推廣應(yīng)用。對于該類相關(guān)標(biāo)準(zhǔn),就要有所突破,結(jié)合國內(nèi)外工程案例及相關(guān)國際標(biāo)準(zhǔn)完善國內(nèi)標(biāo)準(zhǔn),建立符合高質(zhì)量發(fā)展的新標(biāo)準(zhǔn)。

當(dāng)前是我國城市軌道交通從高速發(fā)展轉(zhuǎn)向高質(zhì)量發(fā)展的關(guān)鍵時(shí)期。通過做好關(guān)鍵設(shè)施設(shè)備的產(chǎn)品認(rèn)證和功能驗(yàn)證,提高裝備的安全質(zhì)量水平;通過有破有立,完善既有標(biāo)準(zhǔn),建立新標(biāo)準(zhǔn),發(fā)揮標(biāo)準(zhǔn)的引領(lǐng)作用,通過構(gòu)建高標(biāo)準(zhǔn)工程來全面夯實(shí)城市軌道交通高水平運(yùn)營的保障基礎(chǔ)。

Commentary

High-quality Construction as Guaranteed Foundation for Urban Rail Transit High-level Operation

BIXiangli

(Chairman of Shanghai Shentong Metro Group Co., Ltd., Senior Engineer)

The development process of URT (urban rail transit) in China over the past fifty years, especially the rapid development in the last two decades, has proven that high-quality construction is the foundation and prerequisite for URT high-level operation. It is unnegotiable to actuate from the standpoint of people′s aspiration for a better life. By adhering to high starting points and high standards, innovatively devising new mechanisms, and breaking through constraints, an URT system with high planning standards, reasonable and applicable norms, reliable and controllable processes, and verifiable and validated outcomes is constructed.

The key to high-quality construction lies in strengthening the process management of URT key facilities and equipment. The URT equipment market is in a state of open competition, and the risks of product quality and safety are ultimately imposed onto operation units. Due to the short duration and limited coverage of new line trial operation basic condition assessment, full-process control and full-coverage verification of URT system functionality can hardly be enacted, which inevitably leaves some issues behind, undermining operational safety. Therefore, the management concept of product certification and functionality verification must be comprehensively introduced into the process management of URT key facilities and equipment. Implementing comprehensive product certification and functionality verification is a market access approach that aligns with international standards as well as an effective measure to promote healthy development for equipment industry. Comprehensive product certification and functionality verification play an irreplaceable role in ensuring system safety, verifying system functionality, and establishing system quality. Consequently, first, efforts should be further exerted on completing industry standard system, optimizing inspection and testing procedures, and promoting the effective application of third-party data; secondly, the purpose of certification and verification in elevating safety and quality level of URT key facilities and equipment should be practically fulfilled, by reinforcing detection and certification capabilities, improving the quality of certification and verification results, advancing the adoption and application of certification and verification, thus regulating the healthy development of URT equipment industry market.

The key to high-quality construction lies in inciting the leading role of standards. Without high standards at the planning and construction stage, high-quality services on operation service end are nowhere to be found. To achieve high-standard construction that both meets functionality requirements and accommodates the public welfare, economy, and sustainability of URT industry, it is essential to strike a balance between standard improvement and cost control. Therefore, in construction practice, it is indispensable to uphold the guiding role of standards while persisting in breaking grounds and extensively considering various aspects to fully leverage the overall efficiency of URT systems. For example, Shanghai Metro has introduced technical standards related to track control network measurement and precision adjustment of ballastless track from high-speed railway construction into URT construction and operation maintenance, which has greatly improved the technical level of track laying during construction phase, achieving high precision and regularity in track laying. It effectively enhances the smoothness of train operation and passenger comfort while reducing noise, vibration, and vehicle failure rates. Another example is about how travel speed reflects URT operational efficiency. However, due to differences in concepts and definitions of speed restrictions and control among various disciplines such as rolling stock, signaling, track, and structures, the actual travel speed in ATO (automatic train operation) mode may be lower than the line grade speed. Shanghai Metro has studied the speed restrictions and control standards of each discipline within a unified system, ensuring reasonable coordination of requirements between disciplines and achieving the designed travel speed, thus meeting the line grade speed requirements. These relevant standards have been published as group standards and promoted within the industry. Additionally, for underground-excavated stations, among the existing engineering cases, many Japanese shield tunneling construction stations have shield segments of length exceeding 100 meters, with the longest being 275 meters at Iidabashi Station. However, in China, due to limitations imposed by fire evacuation regulations, the maximum length of underground-excavated shield segments without openings is not allowed to exceed 100 meters. Considering evacuation path factors, the allowable length becomes even less, greatly restricting the advocate and application of construction techniques for underground-excavated stations. For such related standards, breakthroughs are needed by combining engineering cases in China and abroad as well as relevant international standards to improve domestic standards and establish new standards that align with high-quality development.

China is currently in a critical period of transition from rapid development to high-quality development for URT industry. By conducting product certification and functionality verification of key facilities and equipment, the equipment safety and quality level can be enhanced. Through a process of revising and improving existing standards and establishing new standards, the leading role of standards shall be harnessed. By constructing high-standard projects, the foundation for ensuring URT high-level operation will be comprehensively strengthened.

(TranslatedbyZHANGLiman)

猜你喜歡
產(chǎn)品認(rèn)證盾構(gòu)軌道交通
軌道交通產(chǎn)品CE認(rèn)證論述
高速軌道交通發(fā)展趨勢
2016年環(huán)境保護(hù)產(chǎn)品認(rèn)證名錄(三)
2016年環(huán)境保護(hù)產(chǎn)品認(rèn)證名錄(一)
盾構(gòu)近距離下穿房屋接收技術(shù)
復(fù)合盾構(gòu)在縱向錨桿區(qū)的掘進(jìn)分析及實(shí)踐
基于CAN的冗余控制及其在軌道交通門禁環(huán)網(wǎng)中的應(yīng)用
我國頒發(fā)首批低碳產(chǎn)品認(rèn)證證書
《盾構(gòu)機(jī)切削刀具》行業(yè)標(biāo)準(zhǔn)頒布
城市軌道交通聯(lián)調(diào)探討
永年县| 香河县| 赤壁市| 长垣县| 乌兰浩特市| 黄大仙区| 京山县| 育儿| 安阳县| 宁强县| 鄂尔多斯市| 武鸣县| 丰原市| 扶余县| 鄄城县| 两当县| 灵璧县| 修水县| 红安县| 汤阴县| 常山县| 泉州市| 响水县| 屏东市| 德令哈市| 丹巴县| 邵阳市| 泉州市| 北宁市| 台东县| 桐柏县| 内丘县| 于都县| 安宁市| 清河县| 南澳县| 邯郸县| 龙岩市| 永嘉县| 闸北区| 霸州市|