圖01 設(shè)計草圖Fig.01 Design Plan
圖02 設(shè)計草圖Fig.02 Design Plan
夏納洛大橋位于奧地利多恩比恩市愛彼列村的夏納洛峽谷,是連通多恩比恩市與愛彼列村的重要道路。在多恩比恩河與優(yōu)美的群山的襯托下,夏納洛大橋別具一格地融入了當?shù)氐淖匀痪坝^當中。這座壯觀的大橋聯(lián)系著愛彼列村的古老聚落區(qū)域,并以眾多的天然巖石隧道與石橋著稱。
大橋的設(shè)計采用了石拱橋的形式,并融合現(xiàn)代科技將拱形的幾何結(jié)構(gòu)展現(xiàn)到了極致。設(shè)計將大橋拱高降低到最小,并將拱底設(shè)計為扭曲的形狀,營造出動靜結(jié)合的效果。而扭曲的設(shè)計隨著橋道駕駛道形成曲線,與彎曲的道路相呼應(yīng)。這樣,這個鋼筋混凝土結(jié)構(gòu)橫跨了整個小峽谷,而駕駛者在通過時很難察覺這種特色,但從蜿蜒的河岸上仰視大橋時,則能夠感受到大橋的魅力之處:它不僅模仿了山路蜿蜒的動態(tài)感,還通過鋼筋水泥的結(jié)構(gòu)突顯了這個地域的鮮明特征。
The bridge through the Schanerloch gorge is part of the impressive road from the city of Dornbirn to the hamlet of Ebnit which picturesquely situated by the well of the river Dornbirner Ache at the foot of scenic mountains.The spectacular route to this ancient settlement area is characterized by a series of natural rock tunnels and stone bridges.
Originating from the well known typology of the stone arch bridge, modern technology takes the geometry of the arch to its very limits. The reduction of the arch rise to a statically necessary minimum is combined with a twist along one axis.The latter is also responding to the bending road as a curve immediately follows the bridge in both driving directions. The result is a concrete sculpture that might look unspectacular in plan and from the driver's point of view, but from the shore of the river winding through the gorge it unveils its compelling fascination: it playfully mimes the frozen dynamic of the mountain road and captures the dramatic place in reinforced concrete.
圖03 大橋上游視覺圖Fig.03 View of the bridge from upstream
圖04 大橋近觀Fig.04 View of the bridge
圖05 大橋下方視覺圖Fig.05 View of the bridge from below
圖06 大橋上游視覺圖Fig.06 View of the bridge from upstream
圖07 通往恩比特之路Fig.07 Road to Ebnit
圖08 大橋下游視覺圖Fig.08 View of the bridge from downstream
Location: Ebniter Stra e, 6850 Dornbirn, Austria Overall length: approx. 23m
Overall width: 5,50m bis 6,50m
項目位置:奧地利多恩比恩市6850號 愛彼列村
總長:約23m
總寬:550m-650m
業(yè)主:多恩比恩市
建筑設(shè)計:馬特·馬特建筑事務(wù)所、維勒建筑公司、伯恩納德·馬特、斯蒂芬·馬特
行車寬度:最小475m
加厚的混凝土拱:最小厚度35cm
混凝土體積:約180m3
基礎(chǔ):直接插入石壁
花費:約22萬英鎊(約225萬元人民幣)
設(shè)計日期:2005年
始建日期:2005年
竣工日期:2005年
圖片來源:馬克·林斯
翻譯:鄺嘉儒
Client: City of Dornbirn
Architecture: Marte.Marte Architekten ZT GmbH, Weiler Arch.DI Bernhard Marte
Arch.DI Stefan Marte
Driving clearance (width): minimum 4,75m
Reinforced concrete arch: minimum thickness 35cm
Concrete volume: approx. 180m3
Footing: directly into the adjacent rock wall
Costs: approximately 220.000€
Start of planning: 2005
Start of construction: 2005
Completion: 2005
Photo credits: Marc Lins
Translation: KUANG Jia-ru